LIST OF PREVIOUS PROJECTS
- 1. Mackintosh Probe Testing for new Air Selangor Control House at Sg. Selisik and Sg. Buah (2020)
- 2. Field Non-Destructive Testing (NDT) and Defect Mapping – Building at Sungai Perak (2021)
- 3. Field Testing for Structural Inspection of Pier G/P4 - Package DASH-CB4, KL (2021)
- 4. Non-Destructive Testing (NDT) and Defect Mapping - Building at Kluang, Johor (2021)
- 5. Non-Destructive Testing (NDT) and Defect Mapping - Building at Bukit Kiara, Kuala Lumpur (2021)
- 6. Non-Destructive Testing (NDT) and Defect Mapping - Building at Jalan Elmu, Kuala Lumpur (2021)
- 7. Non-Destructive Testing (NDT) and Defect Mapping – Building at Ampang, Selangor(2021)
- 8. Non-Destructive Testing (NDT) and Defect Mapping - Kenyir, Terengganu (2021)
- 9. Electrical Resistivity Survey - Kg Gaung, Terengganu (2021)
- 10. Electrical Resistivity Survey - Kenyir Dam, Terengganu (2021)
- 11. Pengukuran Dimensi, Pemeriksaan Visual dan Ujian Bahan – JPSM,Kuala Lumpur (2021)
- 12. Multi-Channel Analysis of Surface Wave (MASW) Survey - Kenyir Dam, Terengganu (2021)
- 13. Electrical Resistivity Survey - Empangan Mardi, Negeri Sembilan (2022)
- 14. Paleoseismic Study & Trenching Work - Kg Gaung, Terengganu (2022)
- 15. Seismic Downhole Survey – Kenyir Dam, Terengganu (2022)